Comparing parking lot paving bids: what to line up before you choose

You asked three contractors about the same lot, and the proposals do not match. That is common, and it does not always mean one company is padding the price. This page gives you a way to put the proposals side by side. It does not list prices, because no honest price exists without seeing the lot.

Gravel lot before paving
Finished asphalt lot at a restaurant

Our American Paving division also published a version of this topic: What drives parking lot paving cost in Louisville.

Start with what each bid assumes

Every bid rests on a guess about what lies under the surface. One contractor may price a thin resurfacing because the base looks sound. Another may price base repair because the pavement flexes. Both can be sincere. The gap between them often comes from this assumption, so ask each contractor to name the condition they are pricing.

Build a comparison sheet

Make one row per item and fill in each bid.

  • Type of work: patch, mill and overlay, or full rebuild.
  • Base repair: how much is included, and what happens if more bad base shows up once the surface is off.
  • Thickness and mix: stated in the proposal, and suited to the traffic. Aisles, entrances and truck routes are harder on pavement than quiet side stalls.
  • Drainage: whether regrading, drain adjustments or tie-ins are included, or only a new surface.
  • Edges and hardware: curbs, islands, ramps, wheel stops and bollards.
  • Markings: stripes, arrows, fire lanes and accessible stalls with signs and aisles.
  • Schedule: one shot, in phases, at night or on a weekend.
  • Extras: permits and utility locates, if they apply.

Why lot size is not the main driver

Square footage sets the quantity of asphalt. It does not tell you the condition of the base, the drainage or the access. A small lot with a failed base can take more work than a large lot that is in good shape.

Climate and drainage

Louisville and Elizabethtown see freezing and thawing and winter salt. If a lot already ponds, new asphalt over the same low spots tends to bring the puddles back. A bid that leaves out drainage may look cheaper now and cost more later.

Staying open changes the work

A lot that stays open needs sectional paving, traffic control and sometimes night or weekend hours. These add setup and labor even though the area is unchanged. If you need the business open, say so up front so every bid prices the same plan.

Weather and start dates

Hot mix goes down on a dry base in the right temperatures. Most commercial paving here is planned for the warmer months, and a delayed start is better than paving a wet base.

A cheaper bid can cost more

A proposal that rebuilds a failing base may prove the better value over a few seasons than a thin surface laid over a problem that keeps spreading. A site visit and a written scope make the difference clear.

Quick answers

Why do bids for same-size lots differ?
Base condition, drainage, thickness, extras and phasing explain most of the gap.
Is resurfacing always cheaper than a rebuild?
It is a smaller scope when the base is sound. If the base has failed, the new surface does not fix what is underneath.
Should drainage show as its own line?
Yes. Ask whether regrading or drain work is included.
Does the whole lot have to close?
Often no. Sectional, night and weekend schedules are common.