Planning the first sealcoat on new asphalt: how long to wait

After a new lot, drive or entrance is paved, the next question is nearly always when to seal it. The answer is later than most people expect. This guide is for owners and managers in Louisville and Elizabethtown who want to put the first sealcoat on the calendar the right way.

Finished asphalt driveway at a home

Our American Paving division also published a version of this topic: When to sealcoat a new asphalt driveway.

The rule

Give new asphalt at least 60 days before the first sealcoat. We suggest planning on 3 months. The asphalt keeps curing for a good while after it is laid, and coating it too soon can cause problems that a few extra weeks would avoid.

Why waiting helps

Fresh asphalt is still settling into its final state. A coating applied over it before that point may not perform the way it should. The extra time costs nothing, and it gives you a chance to see how the new surface drains.

Match the season to the date

Count forward from the day paving finished, then check the weather.

  • Paved in spring or early summer: the first coat usually fits in the fall of the same year.
  • Paved in late summer or fall: the first coat usually waits for the following spring, because cold weather is a poor time to apply sealcoat.
  • Not sure of the exact date: use your invoice or the date on the work order.

Check the surface type

Sealcoat is a product for asphalt. Concrete uses different sealers, and it needs its own care. If you manage a site that has both, make a note of which surfaces get which treatment.

Doing it yourself or hiring it out

A careful owner can coat a small area. Most of the work is prep: cleaning, filling cracks and treating oil spots before any coating goes on. A contractor has the equipment for both the prep and an even coat. The waiting period is the same either way.

After the first coat

Sealing again depends on traffic, sun and drainage, and is better judged from the surface than from a calendar. Signs that a repeat coat is due include faded gray color, small cracks starting to open and loose stone on the surface.

Quick answers

How long do I wait after paving?
At least 60 days. Planning on 3 months is the better target.
We paved in October. When do we seal?
Plan on spring, once the weather is warm enough.
We paved in May. When do we seal?
Plan on the fall.
Can I use sealcoat on concrete?
No. It is made for asphalt, and concrete has its own sealers.